US Copper’s updated PEA estimates NPV over $1 billion
Moonlight – Superior project in California
The study envisions a mine life of 14 years, producing 903,000 tonnes of copper, plus 12 million oz. of silver and 63,000 oz. of gold. A majority of the production will come from mining the sulfide mineralization at Moonlight-Superior.
US Copper CEO Stephen Dunn said the PEA, which a culmination of several years of planning, drilling, metallurgical testing and engineering studies, confirms “substantial economic opportunity” at current copper prices that can be realized through the development of a series of open pit mines on the property.
PEA – preliminary economic assessment
NPV – Net Present Value
Source – Mining.com